• Meters
    • Sensors
    • Concentrators
    • Convertors
    • Splitters
    • Others
  • Log into Enectiva
    • CS
    • ES
    • IT
    1. Tags
    2. Other
    • Requirements for installation work of Enectiva projects - automatic data collection from meters

      The following guidelines must be followed when installing Enectiva projects: In general When replacing meters or installing new ones, a protocol of replacement (new / old states, etc.) will always be filled. It is necessary to write serial numbers of old and new meters, serial numbers of M-bus modules. After installation of any meter, installation of the meter with digital output or installation of the central unit, photo documentation of the site will be made.

      Read more
    • Design of energy measurement systems in industrial areas

      This manual serves as a standard for energy system designers and designers using M-Bus technology. The aim of this standard is to enable clear and transparent allocation of energy consumption to technological units (heating, cooling, ventilation, production, lighting, etc.) or to economic units (tenant, economic center, etc.). Furthermore, the aim of this standard is to prepare the entire measurement system for automatic data collection from individual meters, possible identification of …

      Read more
    • Partner Programme
    • Enectiva Rules
    • Development Blog
    • Contact Us

    Energy management solution Enectiva was developed by the company Enerfis s.r.o.

    Drtinova 557/10 Prague 5
    www.enerfis.cz